Pull Request πΒΆ
Templates πΒΆ
You MUST pick the template that matches your change. The table below links the actual templates.
Change type |
Template |
|---|---|
Server and |
|
Workstation and |
|
Shared system changes such as |
|
CI/CD and workflow changes |
|
Documentation-only changes limited to |
|
Agent-specific changes limited to |
Branch Naming π·οΈΒΆ
Branch names MUST follow the naming conventions defined in branch.md. The branch prefix MUST match the type of change and is used to classify the PR scope and select the CI pipeline.
The protection rules enforced on main are documented in branch.md.
Forking Flow π΄ΒΆ
Before marking a PR as ready for review, CI in your fork MUST be green. The required scope depends on what you changed:
Change type |
Isolated? |
Required CI |
|---|---|---|
Single role |
β No dependencies |
MAY use manual CI for that role only |
Single role |
β Has dependencies |
MUST run full pipeline |
Multiple roles or shared code |
N/A |
MUST run full pipeline |
CI/CD, tooling, systemic |
N/A |
MUST run full pipeline |
If you are unsure whether other roles are affected, you MUST run the full pipeline.
Drafts πΒΆ
You SHOULD open a Pull Request as a draft while your change is still in progress. CI will not run and no reviewer time is spent until you mark it ready.
You MUST mark the PR ready for review before requesting a review. CI starts automatically at that point.
If you continue working on the PR after marking it ready, you MUST convert it back to a draft before pushing new commits. Otherwise CI triggers on every push to the main repository.
You MAY convert it back to a draft at any time. Any running CI jobs will be cancelled immediately.
Checklist β ΒΆ
Before you open a Pull Request:
CI in your fork MUST be green.
Your branch MUST be up to date with
main.Your change SHOULD be small and focused.
Relevant documentation MUST be updated.
The correct Pull Request template MUST be used.
The Pull Request MUST be linked to the related work item in project.infinito.nexus and back.
Screenshots, logs, traces, or migration notes SHOULD be attached when they help review the change.